Lesson 32 Review

  1. Default indirect costs are pre-built _____ ______ created by InEight Estimate, located within the CBS Register.

    1. billing rates

    2. cost items

    3. pay items

  2. By default, any cost item you create in the CBS Register that is not assigned to a pay item is considered indirect cost.

    1. True

    2. False

  3. The cost segment field in the CBS is used to indicate:

    1. Whether your costs will be considered job overhead, business overhead, or direct cost.

    2. The source of your costs (Detail, Plug or Quote).

    3. What pay item your cost item is assigned to.

Lesson 32 Summary

As a result of this lesson, you can:

  • Explain how indirect costs are defined in InEight Estimate

  • Estimate default indirect cost items

  • Estimate user-defined indirect cost items